Dura Vermeer saves approximately 5% on costs per project following BIM 360 implementation

By aligning people, process, standards, and Autodesk technology, Dura Vermeer experienced significant cost savings of approximately five percent per project.

AECOM leverages BIM 360 Design to realize 20% time savings on global collaboration

By implementing BIM 360 Design late into a 24-week project, AECOM was able to save time, enhance productivity, and complete the project on schedule.

BAM uses Point Layout to navigate design challenges on the V&A Museum of Design Dundee

Every wall of the V&A Museum of Design Dundee is curved: sometimes both horizontally and vertically.

Heijmans saves $100,000 during first two months of Dynamo usage

At Heijmans, a number of initiatives to implement Building Information Modelling (BIM) already existed as part of a company-wide BIM approach.

Skanska USA leverages virtual reality to win 5 out of 6 new projects

Skanska engaged Autodesk to help its Tampa-based preconstruction unit develop a technological differentiator. Working in close partnership, Autodesk leveraged VR to create a cost and time-saving template.

Beca reduces project time by 33% with BIM 360 Design

By implementing BIM 360 Design, Beca reduced the project’s duration by a third and met the project’s challenging design deadline—taking full advantage of the time zone span between New Zealand and Indonesia.