Skanska main 1960x
Skanska uses BIM 360 and Forge to help digitize the entire company, cutting future construction time by 25%

A strategic partnership with Autodesk is helping Skanska save time and money while improving health and safety for employees—forging a new, digital path in construction.

Ems courtyard high res 1960x
BAM Construction reduces inspection times by 50% through BIM 360 and reverse mentoring

To achieve full digitization of the English Martyrs School project, BAM Construction devised a reverse mentoring program to upskill current employees and train the next generation of construction workers.

Dps main image 1960x1080
With Revit and Insight, D/P/S saves a client $2.5 million over a 30 year period with net-zero building solutions

The New-Mexico-based architecture firm uses Autodesk solutions during the design phase to maximize both energy efficiency and costs.

Main image 1960x
BAM Ireland improves quality and safety by 20% using BIM 360 and Construction IQ

BAM Ireland, an operating company of Royal BAM Group, greatly improves risk visibility, site safety, quality, and data capture by leveraging Autodesk solutions.

Main image 1960x
Cardno delights clients and reduces engagement time from 3 meetings to 1 using InfraWorks

Partnering with Autodesk gave Cardno a way to improve how it communicated design intent to stakeholders: creating compelling visualizations in 3D.

Main image 1960x
GHD saves over 50% of its time with data-driven, automated workflows for Master Planning

Adopting automation capabilities gives GHD’s Master Planning teams more time for innovation and creativity.

Main image 1080x
GHD uses Dynamo to automate coding capabilities and realizes time savings of up to 99%

The team developed a Python script to automate the management of complex clash results in Navisworks saving up to 9.5 hours per week per user on a single project.

Mccarthy sanjose main 1960x
Forging Ahead: McCarthy reduces workflow by almost 24 hours a week with BIM 360 benefits

Autodesk supported the construction company and helped improve communication on the San Jose State, design-build project in the heart of Silicon Valley.

Aecom sh main image 1960x
AECOM team in China saves over 5% of construction project time, adopting BIM 360 solutions

The AECOM team in China enhanced productivity by centralizing and standardizing the construction management process, lowered project cost and time by reducing rework, and enabled collaboration local projects.