Icon/Nav/Back ArrowBack to Profile
E814E2A1-5EAC-461A-B524-37EECDEA46B7@1x

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.

SUCCESS STORY

Pan Pacific Mechanical Delivers Plumbing Systems for Open-Air SoFi Stadium - The First Indoor-Outdoor Stadium & the NFL’s Largest at over 3 Million Feet

Customer Challenge

Pan Pacific was struggling with collaboration across their global outsourced detailing teams. The demanding schedule for project delivery also made their methods of communication insufficient. The advent of COVID in the final stages of construction also presented a challenge as work-from-home requirements went into effect.

Project Goals

The following priority project goals were identified: 1) On-time delivery of the project with zero defects. 2) Streamlined change order process. 3) Ongoing value engineering. 4) Minimized clashes and implications with earlier detection.

Solution

Autodesk BIM Collaborate Pro was invaluable in the management and coordination with the off-shore detailers. Technical support was made available by Autodesk Solution Provider ProGroup to respond as needed and aligned with Pan Pacific's early 5AM start time daily. Training and coordination with the Autodesk Team was also provided as necessary to optimize the use of all software tools deployed.

Business Outcome

The project was delivered on time and profitably. The communication with the other contractors and project owners went very smoothly and the customer was exceptionally pleased with Autodesk Collaborate Pro as a game-changer.

Conclusion

Pan Pacific has described utilizing BIM Collaborate Pro on this project as being a game-changer. Without that tool they would not have been able to coordinate such a large team including detailers around the world.

Project Summary

Delivery Date

2020-08-15

Project Duration

1460 days

Autodesk Solutions

  • AutoCAD
  • Revit
  • Fabrication CADmep

Services Provided

  • Virtualization
  • System & Software Maintenance
  • System Integration
  • Configuration & Deployment

Customer Industry

  • Architecture, Engineering & Construction