Customer challenge

As a leader in the development of quantum computing systems, D-Wave prioritizes building high-quality systems, software, and services for its customers. With growing needs for increased cross-enterprise collaboration and heightened demand from customers, D-Wave recognized that it needed to improve its current Product Lifecycle Management (PLM). It was particularly looking for a solution that would increase the efficiency of its processes.

Project goals

D-Wave required to solve the following challenges in order to meet its business goals:

  • Bill of Materials (BOM) management and collaboration.
  • Manual BOM and data input into ERP.
  • Lack of integration, automation, and API capabilities of the system in place.
  • Manual change control and change management.

Solution

SolidCAD and D-Wave teams worked closely to create the best strategy that would meet D-Wave’s business requirements. The solution was to:

  • Implement Autodesk’s PLM solution, Fusion 360 Manage platform.
  • Create a bi-directional integration between Fusion 360 Manage and NetSuite ERP.  

Business outcome

Today, D-Wave uses PLM to manage Supply Chain, BOMs and Changes. The live and bi-directional integration between PLM and NetSuite ERP allows D-Wave to gain efficiency and ensure consistent knowledge-sharing by using PLM as the single source of data. 

The result of SolidCAD and D-Wave’s collaboration was a solution that allowed D-Wave to:

  • Replace its existing systems with Autodesk Fusion 360 Manage PLM, one modern centralized platform.
  • Manage BOMs and supply chain needs.
  • Streamline the management of: Vendors, Vendor Part Numbers, Manufactures and Manufacturers Part Numbers.
  • Centralize Change Management processes. PLM has empowered D-Wave to proactively keep track of changes.
  • Make more informed decisions by having access to all the necessary data in one location.  The integration between NetSuite ERP and PLM has enabled the engineering and purchasing teams to increase their work efficiency.

With the Autodesk Fusion 360 Manage PLM solution being a scalable platform, D-Wave will have the opportunity to add more functionalities to its centralized PLM. This enables D-Wave to take advantage of state-of-the-art technologies to ensure that customers have access to the highest standard of products and services.

Conclusion

“The main increase in functionality we have seen is the synchronization of the Fusion 360 Manage PLM database with our ERP database. 

The ability to add custom filtering to searches is much superior to our old system. For example, I can look for parts I created in the last 43 days that have the word “Nut” in the description and are not released to production.

As it comes to time savings, we were able to: 

  • Configure the part numbering system to match our existing method, saving thousands of hours of engineering work.
  • Remove around 8 manual processes/workarounds with Excel to move data around and supply data to our engineers.
  • Configure the Item Master sheet to be able to see all the fields that our engineers care about on one screen. No more flipping back and forth between tabs or scrolling up and down.

As it comes to ERP integration, automation with scripts were able to help us with:

  • On-Creation of a new part; automatically pushes the data to our ERP system.
  • On-Save of a pre-release part; automatically pushes the data to our ERP system every time we edit a part.
  • On-Transaction-in-ERP: pulls data on quantity, on-order, price, and stock location from our ERP back to Fusion. No need for a second license to get the information from the ERP system.
  • Third party middleware: link the two databases bi-directionally. No waiting until midnight for them to sync up.
  • Add-hidden fields for database internal IDs: the middleware can make changes in the other database directly.
  • Links between the part supplier and part manufacturing workspaces to allow them to be linked together and pushed to our ERP system. 

As it comes to Engineering Change Order (ECO) process:

  • Creates very simplified part release that allows for low overhead to our engineers and enables very fast prototyping.
  • Creates more complex workflow for released production parts and assemblies.”

Dave Bruce, Principal Mechanical Engineer at D-Wave

Project summary

    Duration & delivery

  • 730
  • 2022-08-01

    Autodesk solutions

  • Fusion 360 Manage

    Services provided

  • Assessment of Needs
  • Installation
  • Configuration & Deployment
  • System & Software Maintenance
  • System Integration
  • Updates & Upgrades
  • Training

    Customer industry

  • Additive Manufacturing
  • Design
  • Subtractive Manufacturing
More success stories

Streamlining Workflows and Improving Data Management with Fusion 360 Manage!

After an investigation of 3D-P’s issues, the team identified two specific areas they wanted to improve; (1) the inefficient design management that relied heavily on manual data entry, and outdated practices for managing their Bill of Materials (BOMs) and (2) challenges of change management and communication. As the company grew, they realized that a lot of their processes were slowing them down and needed to be optimized.


Rising to The Challenges of The Industry With Vault, Revit, Inventor, Autodesk Construction Cloud And PLM Software!

Today’s push for remote work and custom designs have exposed some logistical difficulties for Starline Windows. To continue providing services in every step of the process, there is a constant need for better tracking and traceability of project commitments, product manufacturing and installation life cycles. Starline Windows faces business challenges that many other businesses face such as (1) lack of design collaboration engagement with external architects and contractors, (2) lack of design revision visibility for field personnel, (3) lack of project cost clarity, (4) limited data transfers between operating systems from the office to the field and (5) lack of cross department visibility in their overall coordination for logistics management.


Improving Efficiency with Fusion 360 Probing

As a leader in the tooling industry, Mega Mold needed an advanced solution with powerful capabilities that could check features during the machining process, automate tedious tasks and make decisions. More specifically, they were looking for an easy way to help verify workpiece accuracy and help make their machining process more efficient.


By accessing and using Partner Finder, you acknowledge and agree to the following Additional Terms as referenced in the Website Terms of Use: (i) Partner Finder may be modified, updated, interrupted, limited, suspended, or discontinued at any time without notice or liability; (ii) any query or request for information regarding a specific provider or provider services may be forwarded to that provider, however Autodesk in its discretion may retain a record to conduct business analytics to improve Partner Finder and other Autodesk products and services; (iii) Autodesk has no obligation to enforce any terms on your behalf against another user; and (iv) any feedback you provide in connection with a provider, including ratings or reviews, is a non-confidential “Submission” as defined in the Website Terms of Use. You are advised to conduct your own independent analysis and assessment of any information provided by or though Partner Finder, including whether a selected provider is appropriate for your particular circumstances. Without limiting the Website Terms of Use, Autodesk does not warrant, endorse, guarantee, or assume responsibility for any service advertised or offered by a provider through Partner Finder or any hyperlinked website or service. Autodesk is not liable for the content of this site, or for the consequences of any actions you may take based on information provided by, or through, this site. You release Autodesk and its affiliates and subsidiaries from all liability arising from your use of Partner Finder, including any hyperlinked website, service, or content.

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.