Icon/Nav/Back ArrowBack to Profile
E814E2A1-5EAC-461A-B524-37EECDEA46B7@1x

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.

SUCCESS STORY

Improved Efficiency with BIM for BCA & URA Authority Submission

Customer Challenge

TCP Consultants Pte Ltd is offering professional and expert services in Civil and Structural Engineering consultancy and project management works. They spent a significant amount of time on producing drawings from design to the submission phase by using their CAD workflow. ​ This was a tedious process due to the lack of file exchange method. TCP Consultants Pte Ltd wanted to use BIM-based processes instead to improve their efficiency in preparing BCA & URA authority submissions.

Project Goals

Our team at INNOCOM TECHNOLOGIES helped TCP Consultants Pte Ltd to move forward from the tedious process of preparing BCA & URA drawings for approval and enabled them to move to BIM for BCA & URA submission for approval within the given timeline for project delivery.

Solution

We recommended and implemented their perfect solution with the Autodesk Architecture, Engineering & Construction Collection for BIM and set up the integration workflow for BCA & URA Authority Submission.​

Business Outcome

TCP Consultants Pte Ltd found success with their new solution after implementation and saw an overall improvement in productivity with BIM as well as reduction of rework time and errors.

Conclusion

"We followed the BIM workflow according to the company's standardized guidelines and constructed the BIM Model for Authority Submission and 3D Visualization presentation for the client's viewing. "​ ~ Sharon Lim (TCP CONSULTANTS PTE LTD)​

Project Summary

Delivery Date

2020-08-18

Project Duration

300 days

Autodesk Solutions

  • AutoCAD
  • Revit

Services Provided

    Customer Industry

    • Architecture, Engineering & Construction
    Return to Partner Profile