Icon/Nav/Back ArrowBack to Profile
E814E2A1-5EAC-461A-B524-37EECDEA46B7@1x

This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.

SUCCESS STORY

Improve Productivity, Reduce Rework and Accelerate Project Delivery with Multidisciplinary 3D Modeling and BIM Services

Customer Challenge

Ambey Group are real estate developers that required a collection of solutions that would enable the practice experts to deliver a range of services across architecture, master planning and urban design, sustainable design, reality capture, and asset and facilities management. They needed a set of solutions that would assist them in mitigating project risk and help their clients deliver buildings on time and on budget.

Project Goals

The construction industry has relied on the age-old traditional methods of 2D plans and hasn’t been able to adapt to the changes in new methodologies. Yet, currently, not many methods for betterment are being adopted. As industry leaders for BIM strategy implementation and BIM project delivery, Trisita Engineering LLP identified the use of BIM technology as the right solution for Ambey Group for betterment due to easy application in order to save a great deal of time and cost.

Solution

Autodesk BIM 360 was implemented to do just that and additionally help:
1. Clients with better requirement capturing thanks to enhanced communication with design team
2. Designers with increased clarity in design intent, easy testing of design options and easy distribution of design documentation across teams
3. Contractors with access to better quality information for estimation and bidding, early involvement to contribute to construct-ability, effective scheduling and clash-free construction

Business Outcome

Information is now more easily shared and can be a value-add and reused. Building proposals can be rigorously analysed, simulations performed quickly, and performance benchmarked, enabling improved and innovative solutions. Environmental performance is more predictable, and lifecycle costs are better understood. Documentation output is flexible and exploits automation. Proposals are better understood through accurate visualization.

Conclusion

Using BIM services helped Ambey Group to improve their productivity, reduce rework, and accelerate their project delivery. Not only does it mitigate project risk, but it also delivers dramatic benefits including improved accuracy and efficiency in scoping, a ‘single source of truth’ for project information providing transparency and certainty for all parties, and data capture for future operations and maintenance.

Project Summary

Delivery Date

2019-06-30

Project Duration

35 days

Autodesk Solutions

  • BIM Collaborate
  • Civil 3D
  • Docs

Services Provided

  • BIM
  • API/Script Support
  • BIM/CAD Standards
  • Forge
  • Migration

Customer Industry

  • Architecture, Engineering & Construction
Return to Partner Profile