This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.

SUCCESS STORY

Improve Productivity, Reduce Rework and Accelerate Project Delivery with Autodesk Powermill

Customer Challenge

Govind Steel are real estate developers that required a collection of solutions that would enable the practice experts to deliver a range of services across manufacturing. This industry facing some challenges in manufacturing their products in large scale, automatic NC code generations, unable to generate good finishing parts as per their requirements.

Project Goals

The industry has relied on the manholes covers and frames, cast iron weights and ductile iron castings with the age-old traditional methods of castings and hasn’t been able to adapt to the changes in new methodologies. Yet, currently, not many methods for betterment are being adopted. As industry leaders for Autodesk Powermill strategy implementation and casting project delivery, Trisita Engineering LLP identified the use of manufacturing in Autodesk Powermill and generating NC code technology as the right solution for Govind Steel for betterment due to easy application in order to save a great deal of time and cost.

Solution

Autodesk Powermill was implemented to do just that and additionally help: 1. Clients with better requirement capturing to enhanced communication with design and manufacturing team 2. Manufacturers and operators with increased clarity in design intent, easy testing of NC codes generations options and easy distribution of setup sheet across teams. 3. High progress in quality of jobs with efficient finishing strategies.

Business Outcome

With Autodesk Powermill, information is now more easily shared and can be a value-added and reusable. Building proposals can be rigorously analyzed, simulations performed quickly, and performance bench marked, enabling improved and innovative solutions. Environmental performance is more predictable and life cycle costs are better understood. Documentation output is flexible. Proposals are better understood through accurate visualization.

Conclusion

Using Autodesk Powermill services helped Govind Steel to improve their productivity, reduce rework, and accelerate their project delivery. Not only does it mitigate project risk, but it also delivers dramatic benefits including improved accuracy and efficiency in scoping, a ‘single source of truth’ for project information providing transparency and certainty for all parties, and data capture for future operations and maintenance.

Project Summary

Delivery Date

2021-02-08

Project Duration

45 days