This page has been translated for your convenience using a machine translation service. Reasonable efforts have been made to provide an accurate translation; however, no automated translation is perfect nor is it intended to replace human translators. As a result, this translation may contain errors and inaccuracies. Autodesk provides no warranties, either express or implied, about the accuracy, reliability, or completeness of the machine translation and disclaims all liability for any losses or damages caused by, or resulting from your reliance on, this translation. The English version of this website is the official version.

SUCCESS STORY

Changeover to a Single Software Platform

Customer Challenge

During the Business Process Assessment (BPA), we found that Hunt Electric had been struggling with multiple platforms to get their jobs completed. With many hours lost from rework and lost data going from multiple platforms to the other, they were looking for a solution to bring everyone on the design side to one design software platform.

Project Goals

Hunt Electric had these specific goals in mind: 1. Finding where the gaps are in their design process 2. Convey findings and suggest solutions 3. ProSoft to help with implementation of the solution 4. Work further with Autodesk to help with other possible solutions

Solution

After reviewing the BPA and making some suggestions, they chose to move to the BIM 360 Platform. During the pandemic, BIM 360 Design was crucial for them to work from home. Moreover, they were very successful with it.

Business Outcome

The BIM 360 Design portion was so much of a success that they are now exploring additional BIM 360 products to see if they can streamline other workflows to help on the Cost/BID, Pre-Construction, and Construction phases.

Conclusion

ProSoft was able to work directly with the Hunt Electric Design Staff and Management to help them find the gaps they were facing. We were able to help them improve their workflow to make it run more smoothly from start to finish. They are currently working with Prosoft and Autodesk on a 60-day trial basis to try to implement some of the other BIM 360 Products, like BIM 360 Build to see if they fit into their workflows.

Project Summary

Delivery Date

2019-09-24

Project Duration

45 days

Autodesk Solutions

    Services Provided

      Customer Industry

      • MEP Engineering